This week, Home Towne Electric, the electrical sub-contractor, performed installation of poles and signals, installed electrical wire, and installed conduit.

Next week, A. Lamp Concrete Contractors is scheduled to perform grading for new sidewalk, retaining wall construction, and cutting the existing curb.

There will be no full ramp closures throughout the duration of the project.  However, there may be instance when getting around this area will be difficult due to  construction operations.